Finished up the last of the glass beading, I hope!
Frame back from sandblast shop, I asked them not to blast the entire frame, as most of the original paint was still good, looks like a full frame refinish now...I need to test fit some parts before having welds chased on lower cradle. I will also make & weld on a skid plate to bottom of the frame, I have noticed a lot of late 80"s early 90"s factory bikes had welded skid plates.
Pipe blasted also, looks much better, still need to get dents blown out, then sand & blue welds
That's it for a while, time to do some riding down in Fla!
The Shop
Luxon 4-Post Bar Mounts
$189.95 - $239.95
DeCal Works Huge Plastic Inventory of UFO and Polisport kits.
Nos rear pedal, Ti spring..
Works connection Kx 500 frame guards fit with minimal modification to left side guard, rt side bolts right on.
Made mockup of skid plate to be welded into lower frame cradle. Have foot pegs fitted, but need to to have welder build up bottom of peg brcts & replace rear brake pedal post.
Evo -MX continues to impress with very high quality products!
Had a few stripped out bolt holes repaired, new rear brake pedal mount, lower engine mounts rewelded & skid plate welded. Had to mount up engine cases to line up oil drain bolt & drill hole for access. Mounted number plate back grounds & radiator shroud decals. Frame off to powdercoater tomaro. Still waiting on plater to do my batch of hardware, may stop in at platers shop tomaro with some coffee & donuts to like a fire under their ass...
Factory swingarm color was lighter than what I"m using, wanted a closer match to the Ti spring, went with the look of the later 90"s kx grey. We"ll see how it looks against the powdercoated frame before I apply the arm decals.
Box of Joe & dozen donuts always works! Had some of my 82 RM 250 hardware plated also, I"ll put that together while I wait for frame back from PowderTech. Now I can reassemble a lot of sub assemblies while I wait for the frame.
Pit Row
Frame back from powdercoater. Put a few hrs into it today...
Airbox 101..….who knows how long the p.o. Was sucking dirt at the cage to boot junction, like most late 80"s & 90"s bikes did. I remember disassembling every airbox back then to silicone the airbox to boot. Gave the box the carbon fiber look. Front wheel built, new tusk rotor.
Pretty much as far as I can go without the forks.....once I get a roller I can focus on the engine, I did swap out the original power valve parts with the better set I found, needless to say, I can swap out & setup these Kip's valves pretty fast now.