Posts
191
Joined
1/15/2012
Location
Washington, IA
US
Kevin_Reed
4/11/2019 6:37pm
4/11/2019 6:37pm
Edited Date/Time
4/22/2019 2:14pm
I have 3 torn down to the frame and 85 percent parts purchased, about $5000 invested. It is my busy time of the year and now barely 30 minutes a week to work on them. Its easy to purchase stuff but man the hours and hours of elbow grease. Doing my own sand and vapor blasting and painting. Radiator straightening and aluminum weld repair. The joy of completion is great. Oh, I would like to ride my track now that the weather is nice. Two 1994 CR 250s and a Team Peak 1992 CR125 and I have three other Hondas completed.
And post pics of your bikes.
But the night before going riding can really add up with all the checking over, oil changes, filter cleaning, etc. Luckily we can only carry 5 out of the 8.
The Shop
Post a reply to: What is the most builds you have going had at one time?