General Info
Parts
Restored from top to bottom.
Complete engine rebuild including new crank. Gearbox, New bearings throughout. New Tyres, Cables, Pads, Graphics, Bars etc. 97 PWK Carb.
Original plastics and tank hand restored using Plastic Renew
Raced at the 2014/15/16 Farleigh Castle VMXDN in EVO 250 Group 1
Restored from top to bottom.
Complete engine rebuild including new crank. Gearbox, New bearings throughout. New Tyres, Cables, Pads, Graphics, Bars etc. 97 PWK Carb.
Original plastics and tank hand restored using Plastic Renew
Raced at the 2014/15/16 Farleigh Castle VMXDN in EVO 250 Group 1
View replies to: Suzuki RM250 1989
Comments